SciELO - Scientific Electronic Library Online

 
vol.41 issue2Multimetric Analysis of a Simulated Mixed Traffic of Motorcycles and Automobiles: Flow, Energy, CO2, and CostsComparative Study of Theoretical and Real Deflection of Simple and Reinforced Concrete Joists author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


Ingeniería e Investigación

Print version ISSN 0120-5609

Abstract

BAEZA-SERRATO, Roberto. A Novel Dynamic and Fuzzy Value Stream Mapping (DFVSM): System Dynamics and Fuzzy Logic Integration. Ing. Investig. [online]. 2021, vol.41, n.2, e102.  Epub June 17, 2021. ISSN 0120-5609.  https://doi.org/10.15446/ing.investig.v41n2.84539.

Value stream mapping (VSM) is a method to identify waste and activities that do not add value. One of its main disadvantages is that the parameters used in the process and material flows are deterministic. The motivation of this research is to improve the reliability of the estimation of the lead time in VSM, transitioning from a static model to a dynamic model that incorporates uncertainty and imprecision in the data, as well as to develop a novel dynamic and fuzzy value stream mapping (DFVSM) based on integrating system dynamics and fuzzy logic. One of the main contributions of this research is to develop a fuzzy system in the same system dynamics interface that incorporates uncertainty and vagueness to the efficiency and effectiveness percentage variable (OEE%) to increase the reliability of the delivery time planning. The stages of DFVSM are explicitly described and applied to real data for a textile company in southern Guanajuato. A sensitivity analysis of the proposed model was integrated which identifies the critical factors for the delivery of the order, and achievable times were proposed for the delivery times of the supplier and the client, thus reducing the expected delivery time by 28%. One of the relevant conclusions of this work is that, to plan the lead time of an order, the uncertainty of the main parameters such as supplier and customer shipping times be considered to satisfy the customer.

Keywords : value stream mapping; system dynamic; fuzzy system; normal probability density.

        · abstract in Spanish     · text in English     · English ( pdf )