Servicios Personalizados
Revista
Articulo
Indicadores
- Citado por SciELO
- Accesos
Links relacionados
- Citado por Google
- Similares en SciELO
- Similares en Google
Compartir
Revista Facultad de Ingeniería Universidad de Antioquia
versión impresa ISSN 0120-6230versión On-line ISSN 2422-2844
Resumen
GONZALEZ, Leonardo José; KALENATIC, Dusko y MORENO, Karol Vivivana. Integral and dynamic methodology applied to scheduling and control project. Rev.fac.ing.univ. Antioquia [online]. 2012, n.62, pp.21-32. ISSN 0120-6230.
This paper presents the implementation of the integral and dynamic methodology in the scheduling and dynamic control of projects. For this purpose and using the above-mentioned methodology, a model which combines activity networks AON (activity on node), CPM, multimode execution and system dynamics is developed. The model is operationalized by developing two separate networks, i.e., a scheduling network on the one hand and the execution network on the other hand, in order to interact through a control loop. The proposal is validated using activity networks with 16 activities selected from MRCPSP of PSPLIB library. The model derived from the methodology has significant advantages in characteristic indicators of the project management. The paper concludes with a proposal of new combinations of tools, which, together with the methodology, can address problems of scheduling and control of projects with greater variability and complexity.
Palabras clave : CPM; Systems Dynamic; MPSP; Project Control; integral and dynamic methodology.