SciELO - Scientific Electronic Library Online

 
vol.83 issue195Numerical simulation to assess the elastic-strain energy distribution in a silicon rubber disk subjected to a punch shear test (PST)Fingerprint verification using computational geometry author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


DYNA

Print version ISSN 0012-7353

Abstract

HAJALI-MOHAMAD, M. T.; MOSAVI, M. R.  and  SHAHANAGHI, K.. Optimal estimating the project completion time and diagnosing the fault in the project. Dyna rev.fac.nac.minas [online]. 2016, vol.83, n.195, pp.121-127. ISSN 0012-7353.  https://doi.org/10.15446/dyna.v83n195.44293.

The main objective of the project management team is to implement the project taking into consideration the Budget, schedule and constraints. In addition, project accomplishment, especially with large projects, requires the project to be correctly envisaged. Earned value (EV) management is a valuable technique for analyzing and controlling the performance of the project and predicting the total cost before its completion. Thus, fuzzy systems such as Adaptive Network based on the Fuzzy Inference System (ANFIS) and Parallel Structure based on the Fuzzy System (PSFS) are used to predict the project completion time. In this paper, the plan value diagram is used to predict the earn value diagram using three methods. These three methods are based on the PSFS and Neural Networks (NNs), which help with the implementation of the projects in organizations. The results of these three methods decreased the prediction error of the EV diagram by up to 2%.

Keywords : Earned Value; Plan Value; ANFIS; PSFS; Neural Network.

        · abstract in Spanish     · text in English     · English ( pdf )