SciELO - Scientific Electronic Library Online

 
vol.83 número195Numerical simulation to assess the elastic-strain energy distribution in a silicon rubber disk subjected to a punch shear test (PST)Fingerprint verification using computational geometry índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Não possue artigos similaresSimilares em SciELO
  • Em processo de indexaçãoSimilares em Google

Compartilhar


DYNA

versão impressa ISSN 0012-7353

Resumo

HAJALI-MOHAMAD, M. T.; MOSAVI, M. R.  e  SHAHANAGHI, K.. Optimal estimating the project completion time and diagnosing the fault in the project. Dyna rev.fac.nac.minas [online]. 2016, vol.83, n.195, pp.121-127. ISSN 0012-7353.  https://doi.org/10.15446/dyna.v83n195.44293.

The main objective of the project management team is to implement the project taking into consideration the Budget, schedule and constraints. In addition, project accomplishment, especially with large projects, requires the project to be correctly envisaged. Earned value (EV) management is a valuable technique for analyzing and controlling the performance of the project and predicting the total cost before its completion. Thus, fuzzy systems such as Adaptive Network based on the Fuzzy Inference System (ANFIS) and Parallel Structure based on the Fuzzy System (PSFS) are used to predict the project completion time. In this paper, the plan value diagram is used to predict the earn value diagram using three methods. These three methods are based on the PSFS and Neural Networks (NNs), which help with the implementation of the projects in organizations. The results of these three methods decreased the prediction error of the EV diagram by up to 2%.

Palavras-chave : Earned Value; Plan Value; ANFIS; PSFS; Neural Network.