SciELO - Scientific Electronic Library Online

 
vol.87 número212Decision-making support for truck selection: a systematic reviewA conceptual framework for the modelling and simulation of social systems índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Não possue artigos similaresSimilares em SciELO
  • Em processo de indexaçãoSimilares em Google

Compartilhar


DYNA

versão impressa ISSN 0012-7353versão On-line ISSN 2346-2183

Resumo

ORTIZ-PIMIENTO, Nestor Raul  e  DIAZ-SERNA, Francisco Javier. An optimization model to solve the resource constrained project scheduling problem RCPSP in new product development projects. Dyna rev.fac.nac.minas [online]. 2020, vol.87, n.212, pp.179-188. ISSN 0012-7353.  https://doi.org/10.15446/dyna.v87n212.81269.

New product development projects (NPDP) face different risks that may affect the scheduling. In this article, the purpose was to develop an optimization model to solve the RCPSP in NPDP and obtain a robust baseline for the project. The proposed model includes three stages: the identification of the project’s risks, an estimation of activities’ duration, and the resolution of an integer linear program. Two versions of the model were designed and compared in order to select the best one. The first version uses a method to estimate the activities’ duration based on the expected value of the impact of the risks and the second version uses a method based on the judgmental risk analysis process. Finally, the two version of the model were applied to a case study and the best version of the model was identified using a robustness indicator that analyses the start times of the baselines generated.

Palavras-chave : project scheduling; new product development; baseline; risks; random duration; robustness.