SciELO - Scientific Electronic Library Online

 
vol.87 número214Evaluación morfológica y nutricional de mudas de ‘caraíba’ fertirrigadas con efluente de alcantarillado doméstico con difentes sustratosAnálisis modal experimental de un prototipo de ala de avión para la competencia SAE Aerodesign índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • No hay articulos similaresSimilares en SciELO
  • En proceso de indezaciónSimilares en Google

Compartir


DYNA

versión impresa ISSN 0012-7353versión On-line ISSN 2346-2183

Resumen

VILCHEZ-TORRES, Mylena Karen; OBLITAS-CRUZ, Jimy Frank  y  CASTRO-SILUPU, Wilson Manuel. Optimization of the replacement time for critical repairable components. Dyna rev.fac.nac.minas [online]. 2020, vol.87, n.214, pp.93-99.  Epub 30-Oct-2020. ISSN 0012-7353.  https://doi.org/10.15446/dyna.v87n214.84509.

Equipment-intensive industries must manage critical components due to their impact on the availability and high inventory carrying costs. In this context, this study seeks to assess mean times between interventions (MTBI) and mean times between failures (MTBF) to determine optimal replacement times for critical repairable components used in six EX5500 hydraulic excavators operating at an open-pit mining site. For these purposes, the authors compared a base policy using the MTBF values provided by the equipment manufacturer, against the proposed policy using the MTBI values obtained from equipment intervention records. The results from the study, revealed that the MTBI policy was able to streamline the replacement times for critical repairable components, thus, generating a cost optimization model at a higher level of reliability.

Palabras clave : repairable components; overall cost; Jack-Knife; MTBF; MTBI; Weibull.

        · resumen en Español     · texto en Inglés     · Inglés ( pdf )