SciELO - Scientific Electronic Library Online

 
vol.89 issue223Exergo-economic study of the process for obtaining biochar derived from oil palm kernel shell on an experimental and pilot scaleProposal for the integration of risks in the life cycle of business processes and their relationship with process mining author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • On index processCited by Google
  • Have no similar articlesSimilars in SciELO
  • On index processSimilars in Google

Share


DYNA

Print version ISSN 0012-7353On-line version ISSN 2346-2183

Abstract

GALVIS OCAMPO, Yuly Tatiana  and  SEPULVEDA, Giovanni Franco. Implementation of Software DESWIK® for a polymetallic deposit (Cu - Au). Dyna rev.fac.nac.minas [online]. 2022, vol.89, n.223, pp.141-149.  Epub Nov 15, 2022. ISSN 0012-7353.  https://doi.org/10.15446/dyna.v89n223.100302.

This article seeks to represent the step by step to obtain the economic valuation and the scheduling of a mining project, based on a hypothetical polymetallic deposit of Cu and Au, by applying the concepts of equivalent law to express the presence of the different metals in terms of a single mineral, the critical and marginal cut-off grade to define the economically viable limits of mining and the implementation of the DESWIK software package.

Keywords : NVP; mine planning; pseudoflow; scheduling; cut-off.

        · abstract in Spanish     · text in English     · English ( pdf )