Servicios Personalizados
Revista
Articulo
Indicadores
- Citado por SciELO
- Accesos
Links relacionados
- Citado por Google
- Similares en SciELO
- Similares en Google
Compartir
Ingeniería e Investigación
versión impresa ISSN 0120-5609
Resumen
OSORIO GOMEZ, Juan Carlos; CASTRILLON MONTENEGRO, Oscar Eduardo; TORO CARDONA, Juliana Andrea y OREJUELA CABRERA, Juan Pablo. Hierarchical production planning model in flexible job shop including a preemption and sequence-dependent setup times. Ing. Investig. [online]. 2008, vol.28, n.2, pp.72-79. ISSN 0120-5609.
Production planning and control are complex problems for manufacturing organisations. Hierarchical production planning and control is one way to address the problem as it can reduce its complexity and reach good solutions in reasonable computational time. This paper presents a hierarchical approach to resolving production programming in a flexible job shop configuration; this problem includes preemption and sequence-dependent setup times. Although non-optimal (as expected), good solutions were obtained as shown in the validation of the method.
Palabras clave : hierarchical planning; production programming; preemption; sequence-dependent setup time; parallel machines.