SciELO - Scientific Electronic Library Online

 
 número67Movimiento termo-activado de las dislocaciones helicoidales en el aluminio poligonizadoControl de un prototipo virtual de una máquina de rehabilitación de tobillo índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • No hay articulos similaresSimilares en SciELO
  • En proceso de indezaciónSimilares en Google

Compartir


Revista Facultad de Ingeniería Universidad de Antioquia

versión impresa ISSN 0120-6230

Resumen

TEIXEIRA CORREIA, Gleyce et al. Phosphorus removal in different wastewater by fluidized bed airlift reactors with internal circulation. Rev.fac.ing.univ. Antioquia [online]. 2013, n.67, pp.172-182. ISSN 0120-6230.

The wastewater discharge produces impacts on receiving water bodies. Nutrients as P produce implications on lentic systems because they accelerate the eutrophication processes. Several technologies for P removal from the wastewater have been used: physic chemical treatment systems with important effects by coagulant products addition; biological processes based on anaerobic and aerobic conditions with great implications on the required volume; natural systems as stabilization ponds and irrigation require bigger areas and post-treatment processes. The aerobic fluidized bed reactors with internal circulation (AFBRIC) are compact options with high concentrations of active biomass that have demonstrated their capacity for organic matter and N removal. For sewage from the wastewater pumping station of Ilha Solteira city and effluents of a recirculation aquaculture system (RAS) for semi-intensive tilapia farming, the reactive P and total P removal efficiency in three AFBRIC with 250 mm external tube diameter and different internal tube diameter (ITD), for two different support media at different concentrations was evaluated. The average reactive P removal efficiency for domestic wastewater to hydraulic retention time (HRT) of 3 hours and 125 mm ITD reactor varied from 25,6 to 38,4% and with 150 mm ITD reactor varied from 27,5 to 32,5%; the average total P removal for the RAS wastewater at a HRT of 0,19 hours and 100 mm ITD was of 32,7%.

Palabras clave : Biological phosphorus removal; aerobic reactor; fluidized bed; internal circulation.

        · resumen en Español     · texto en Español     · Español ( pdf )