SciELO - Scientific Electronic Library Online

 
vol.14 issue1Combined Use of GRASP and Path-Relinking during Production Scheduling in order to Minimize Total Weighted Tardiness in a MachineApplication for Statistic Control of Online Processes as Part of a Flexible Manufacturing System author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Ingeniería y Universidad

Print version ISSN 0123-2126

Abstract

MARIN-GONZALEZ, Yeraldin; MONTES-DE LA-BARRERA, José Orlando; HERNANDEZ-RIANO, Helman Enrique  and  LOPEZ-PEREIRA, Jorge Mario. Implementation of Ludic Activities as a Complementary Methodological Tool in the Teaching of the Traditional and the TOC Production Methods for Multitask Environments' Management. Ing. Univ. [online]. 2010, vol.14, n.1, pp. 97-115. ISSN 0123-2126.

The purpose of this study is to design and implement a play activity which simulates a multi-project production system through both the traditional and the TOC production methods in order to manage multitasking environments in the Industrial Engineering Program at Cordoba University. The study also intends to determine the impact of play activity tools on students' academic performance concerning the topic stated above. A quasi-experimental design with pretest, post-test and control group was used. The most important conclusion is that the tools mentioned have a positive effect on academic performance, since the experiment group performed better than the control group.

Keywords : Engineering - Methodology; Production methods - Education, secondary; academic achievement.

        · abstract in Spanish | Portuguese     · text in Spanish     · pdf in Spanish