SciELO - Scientific Electronic Library Online

 
 número20CARACTERIZAÇÃO TERMODINÂMICA PARA SISTEMAS DE ESTERIFICAÇÃO HETEROGÊNEOS EM DESTILAÇÃO REATIVA: I. ENVOLVENTES REATIVASMODELAÇÃO DE VIAGENS INTERURBANOS DE PASSAGEIROS EM SISTEMAS INTERMODAIS DE BAIXA DEMANDA índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Não possue artigos similaresSimilares em SciELO
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Revista EIA

versão impressa ISSN 1794-1237

Resumo

RIVERA, Juan Carlos; MORENO V., Luis Fernando; DIAZ S., Francisco Javier  e  PENA Z., Gloria Elena. A HYBRID HEURISTIC ALGORITHM FOR SOLVING THE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM (RCPSP). Rev.EIA.Esc.Ing.Antioq [online]. 2013, n.20, pp.87-100. ISSN 1794-1237.

The Resource Constrained Project Scheduling Problem (RCPSP) is a problem of great interest for the scientific community because it belongs to the class of NP-Hard problems and no methods are known that can solve it accurately in polynomial processing times. For this reason heuristic methods are used to solve it in an efficient way though there is no guarantee that an optimal solution can be obtained. This research presents a hybrid heuristic search algorithm to solve the RCPSP efficiently, combining elements of the heuristic Greedy Randomized Adaptive Search Procedure (GRASP), Scatter Search and Justification. The efficiency obtained is measured taking into account the presence of the new elements added to the GRASP algorithm taken as base: Justification and Scatter Search. The algorithms are evaluated using three data bases of instances of the problem: 480 instances of 30 activities, 480 of 60, and 600 of 120 activities respectively, taken from the library PSPLIB available online. The solutions obtained by the developed algorithm for the instances of 30, 60 and 120 are compared with results obtained by other researchers at international level, where a prominent place is obtained, according to Chen (2011).

Palavras-chave : Project Scheduling; RCPSP; Heuristic; GRASP; Scatter Search; Justification.

        · resumo em Português | Espanhol     · texto em Inglês     · Inglês ( pdf )