SciELO - Scientific Electronic Library Online

 
vol.16 número32Geometría y Medición en las Pruebas Saber-Grado Quinto ¿Qué evalúan?EPS: Metodología para resolución de enunciados en ciencias básicas apoyándose en pensamiento computacional índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • No hay articulos similaresSimilares en SciELO
  • En proceso de indezaciónSimilares en Google

Compartir


Revista EIA

versión impresa ISSN 1794-1237versión On-line ISSN 2463-0950

Resumen

COCA-ORTEGON, GERMÁN AUGUSTO; CASTRILLON-GOMEZ, OMAR DANILO  y  RUIZ-HERRERA, SANTIAGO. Stakeholders in the production scheduling of a "Job Shop" manufacturing system. Rev.EIA.Esc.Ing.Antioq [online]. 2019, vol.16, n.32, pp.65-84. ISSN 1794-1237.  https://doi.org/10.24050/reia.v16i32.1236.

In this paper, during the programming process of a "Job Shop" manufacturing system, some expectations of the following stakeholders, are integrated: suppliers, society, employees of the organization, clients and shareholders. In this way, a multiobjective evaluation process is designed. This process lets to minimize, the set of variables presented below: makespan time, carbon dioxide emissions, fatigue level, waste global factor and production costs. Likewise, it is expressed that the proposed method is based on the selection of those chromosomes, whose degree of proximity to certain reference points, is the maximum possible. In this respect, the performance of the previous method (method: reference points), is compared with the performance of a certain multiobjective method, based on subgroup analysis (method: subgroups). Thus, it is observed that the first method shows, greater capacity to detect the statistical fluctuation inherent to the data. In this way, it is established that the "method: reference points" exceeds the performance of the "method: subgroups", in terms of the behavior of the parameters "coefficient of variation" and "rank", in the case of 4 (makespan time, carbon dioxide emissions, fatigue level, production costs) of the 5 variables analyzed.

Palabras clave : multiobjective methods; production costs; fatigue level; stakeholders; Job Shop.

        · resumen en Español | Portugués     · texto en Español     · Español ( pdf )