SciELO - Scientific Electronic Library Online

 
vol.23 número2Estimation of the CO2 flux index in the San Andrés Island using fuzzy logicFormulation of indicators for the measurement of products of engineering research groups for their application in the SINFONI platform of the Cooperative University of Colombia índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Não possue artigos similaresSimilares em SciELO
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Ingeniería y competitividad

versão impressa ISSN 0123-3033versão On-line ISSN 2027-8284

Resumo

RUIZ-TORRES, Alex J.; ABLANEDO-ROSAS, Jose  e  JURBURG, Daniel. Flowshop scheduling with machine deterioration based on job sequences. Ing. compet. [online]. 2021, vol.23, n.2, e20410099.  Epub 18-Maio-2021. ISSN 0123-3033.  https://doi.org/10.25100/iyc.v23i2.10099.

This paper addresses the two-machine permutation flowshop problem with deterioration. The objectives are minimizing the makespan and the average tardiness. Jobs have a baseline process time in each machine and have a due date. The actual time to process a job depends on the machine performance level at the start of each job, which is a function of the previously processed jobs and their wear/deterioration effect on the machine. The article proposes multiple heuristics and a comprehensive set of experiments. The results indicate that as a group, the heuristics generate solutions that are very close to the optimal for both criteria. Furthermore, no heuristic approach is dominant for all experimental conditions, thus heuristic selection to solve practical problems should be based on the specific problem characteristics.

Palavras-chave : Maintenance; Makespan; Permutation flowshop; Scheduling; Sequence-dependent systems; Tardiness.

        · resumo em Espanhol     · texto em Inglês     · Inglês ( pdf )