Ingeniería e Investigación

versión impresa ISSN 0120-5609

Ing. Investig. vol.39 no.2 Bogotá mayo/ago. 2019

https://doi.org/10.15446/ing.investig.v39n2.78639 

Artículos originales

Optimal vehicle-to-grid strategy for a fleet of EVs considering the batteries aging

Estrategia óptima de vehículo-a-red para vehículos eléctricos considerando el envejecimiento de sus baterías

Semaria Ruiz1 

Jairo Espinosa2 

1 Electrical Engineer, Universidad Nacional de Colombia, Colombia. M.Sc. in Industrial Automation, Universidad Nacional de Colombia, Colombia. Affiliation: Ph.D. student in Engineering - Energetic Systems, Universidad Nacional de Colombia, Colombia. E-mail: seruizal@unal.edu.co

2Electronics Engineer, Universidad Distrital Francisco Jose de Caldas, Colombia. Ph.D. in Applied Sciences, Katholieke Universiteit Leuven, Belgium. Affiliation: Full Professor, Universidad Nacional de Colombia, Colombia. E-mail: jespinov@unal.edu.co


RESUMEN

El uso de vehículos electricos para transporte publico es una practica que se ha extendido ampliamente en los ultimos años, en respuesta a las necesidades de reducir las emisiones globales de gases contaminantes y disminuir los vehículos de uso privado. Sin embargo, hoy en día es necesario superar algunos retos para proporcionar este tipo de servicios con vehículos electricos, como los margenes de baja ganancia que pueden tener los operadores de la flota. Este documento aborda este desafío, dando al EV publico la funcion de proporcionar energía a la red electrica. Por lo tanto, se propone un sistema de control basado en la optimizacion para realizar una gestion economicamente rentable de la carga y descarga de los EV que se utilizan para proporcionar servicios de transporte publico por parte de un operador, los cuales tambien tienen la posibilidad de entregar energía a la red electrica. Ademas, este sistema de control tambien tendra en cuenta el costo de desgaste de las baterías.

Palabras clave: Envejecimiento de baterías; Fuentes renovables; Optimizacion no lineal; Vehículo a red; Vehículos electricos

ABSTRACT

The use of electric vehicles for public transportation is a practice that has spread widely in recent years, in response to the needs of reducing global polluting gases emissions and decrease vehicle ownership. However, nowadays some issues need to be addressed to provide this type of services with electric vehicles, such as the low-profit margins that can be achieved by the fleet operators. This paper addresses this issue giving to the public EVs the feature of providing power to the electrical network. Hence, a control system based on optimization is proposed to perform profitable management of the charge and discharge of the EVs that are used to provide public transport services by an operator, which also have the possibility of delivering power to the electrical network. Furthermore, this control system will also take into account the batteries wear cost.

Keywords: Batteries aging; Electric vehicles; Nonlinear optimization; Renewable sources; Vehicle-to-grid

Introduction

Nowadays a change in the mobility paradigm is emerging regarding the replacement of private usage of fossil-fueled vehicles by more eco-friendly and energy-efficient mobility services, such as the electro-mobility for public transport and the electric car-sharing (Firnkorn and Muller, 2015; Seign, Schussler, and Bogenberger, 2015). Moreover, the adoption of electric vehicles presents an opportunity to provide energy storage-based ancillary services to the power grid, such as supporting grid frequency stability, contributing to the voltage regulation system, and smoothing intermittency due to renewable energy sources (Kang, Duncan, and Mavris, 2013), which is called vehicle-to-grid operation mode (V2G). However, this operation mode imposes additional challenges, such as the management of bi-directional power flows, and the design and implementation of more complex operation strategies that must achieve the economic sustainability of the service. Therefore, it is necessary to propose decision-making tools that allow the operator to take the best economic and operational decisions for the EVs, such as those presented by previous authors (Alkhafaji, Luk, and Economou, 2017; Rabiee, Sadeghi, Aghaeic, and Heidari, 2016; Wu, Yang, Bao, and Yan, 2013). However, these previous works do not consider the batteries wear due to the adoption of the V2G strategy. The wear of the EVs batteries is a critical aspect, as highlighted by Semanjski and Gautama (2016), to reach the satisfactory commercial feasibility of a transport system that involves electric vehicles. As a result, some studies have focused on the inclusion of batteries wear cost when the EVs are featuring the V2G operation mode. Various authors have addressed this issue (Choi and Kim, 2016; Correa-Florez, Gerossier, Michiorri, and Kariniotakis, 2018; Han, Han, and Aki, 2014; Xu, Shi, Kirschen, and Zhang, 2018) using the Achievable Cycle Count function defined by the battery manufacturer, as in Choi and Kim (2016) and Han et al. (2014), or with the Rain-flow algorithm to cycle counting, as in Xu et al. (2018). Authors as Bocca, Chen, Macii, Macii, and Poncino (2018) proposed to use the Arrhenius equation to evaluate the wear of EVs for residential usage and established an optimal charging plan to reduce the charging and wear costs. Nevertheless, all the previous cited studies only calculate the wear of all the EVs aggregated in a set and not individually. The study of Choi and Kim (2016) only considers one EV. These calculations are an approximation, as for a fleet of EVs, each vehicle will have a different wear cost, depending on the routes assignment.

This paper proposes a control strategy for the optimal management of a fleet of EVs that are used to provide public transport services and operate in V2G mode. The proposed control strategy, based on optimization, makes a trade-off between the charging costs of the EVs and the revenues obtained by delivering power to the electric network, considering the battery wear cost of each vehicle in the fleet. The decision variables calculated are the charging and discharging power and the route assignment for each EV. The control strategy is applied to the study case proposed by Ruiz, Arroyo, Acosta, Portilla, and Espinosa (2018).

The contributions of this paper cover two issues. The first one is the individual calculation of batteries wear, i.e. for each EV, which is performed simultaneously with the assignment ofroutes to the EVs in the fleet, and the estimation of charging/discharging profiles. The second issue is the proposal of an explicit mathematical function for calculating the peaks in the energy ofthe battery, which allows counting the charging/discharging cycles using the Rain-flow algorithm.

This paper is divided as follows. The Methodology section describes the theoretical framework and the optimization approach. The section Study case contains the data of the study cases used to compare the wear results and to apply our proposed control strategy. At last, Results and analysis contain the obtained results and their interpretation.

Methodology

In this study, we considered that all the electric vehicles are parked at the same place and that they are connected to the same charging station. Additionally, round-trip travels are assumed. Hence, an EV can be charged or discharged at any moment after finishing the travel.

Figure 1 depicts the structure of the proposed control algorithm. The algorithm is composed of astage of estimation of the required travels and the calculation of the power consumption in them. These procedures are performed by software of traffic microsimulation, entering specific fluxes of passengers at some places (stations of the EVs) in the traffic network. Once the number of passengers that need to be transported to a defined destination point is established, the required departures of the vehicle are calculated. With the calculated route and with a "typical" speed profile, the power consumption of the vehicle is estimated. After the estimation of both variables for a typical day, the estimated data are entered as the input of the control algorithm block.

Source: Authors

Figure 1 Control strategy scheme 

In the control algorithm block, an optimization is constructed. The aim of this optimization is the reduction of the energy and battery wear costs. The energy cost takes into account the expenses for purchasing energy to charge the EVs and the revenues generated by the delivering power from EVs to the electric network. Furthermore, the constraints include the operational limits of the EVs and guarantee the coverage of the required routes assigning each travel to one of the vehicles in the fleet. The outputs of the optimization are a binary matrix that indicates the vehicle selected to perform each travel and the magnitudes of the charging and discharging powers for each EV and each time step. The mathematical approach used by the constructor of the optimization is described below.

Mathematical approach of the optimization

Objective function and constraints:

First, the decision variables are defined. They are the real-valued matrices P c e ℝnxv that represent the charging power for each EV in the set V = {1,...,v}, where v is the total amount of vehicles in the fleet considering each time step in the set N = {1,..., n} and n is the number of steps in the calculation period; and P d enxsv that represents the discharging power for each EV. Additionally, the optimization has other two decision variables with binary values. The first one is the matrix A v erxv whose elements (i, j) have unitary values if the j-th vehicle performs the i-th travel, which belongs to the set of travels R = {1,..., r}. Hence, if vehicle number 4 performs the first travel, then A v (1,4) = 1. The second one is the matrix A c enxv that indicates if a vehicle is charging and contains unitary values in the positions corresponding to the time steps at which a vehicle is charging.

The objective function is the minimization of the EVs operative costs, which include the expenses for purchasing energy to charge the EVs and the batteries wear cost. Additionally, the revenues generated by delivering power from EVs to the electric network are included. This objective function is indicated in Equation (1).

where p c(i) and p d (i) are the column vectors of the matrices P c and Pd, respectively; w is the wear cost function, Ep e Rn is the electricity price at each time step, and S(¿) are the column vectors of the state of charge matrix S e(n+1) xv, which is also called SOC and is calculated using the Equation (2) for the i-th vehicle at the j-th time step.

P r e nxv is the matrix that contains the power consumption for the travels performed by each EV at each time step, after each travel is assigned one of the EVs. σ is the self-discharging factor of the batteries and Em, the maximum energy that can be stored in them.

The matrix P r depends on the travels assignment. Equation (3) indicates how to calculate this variable.

C t ∈ ℝnxr is the matrix that contains the power consumption in each travel, which is the output of the urban traffic microsimulation,

Furthermore, the optimization constraints, are shown in Equations (4)-(12):

Pr, P c , and P d must be positive real-valued matrices:

The state of charge of the batteries must be kept between the minimum allowed energy content Sm, and 1.

The total power consumption in the travels at each time step, must be equal to the total power that the EVs spend during their assigned travels each time step:

Travels must be assigned only to one vehicle:

The charging power of the EVs must be kept between 0 and its rated value defined by the manufacturer Pc,m, at the time steps when EVs are charged (indicated by ones in the A c matrix).

The discharging power of the EVs must be kept between 0 and its rated value defined by the manufacturer Pcm, at time steps when EVs are discharged, i.e. when they are not performing a travel or charging

where U ∈ ℝ nxv is a binary matrix calculated with Equation (10). The rows of U correspond to the time steps and its columns to the ID number for each EV in the fleet. This matrix has ones in the time steps when a vehicle is performing a travel, and 0 otherwise.

Being At e ℝnxr a binary matrix that contains ones at time steps where travel is required, it has as many columns as required travels. This matrix is obtained from the output data of the urban traffic microsimulator and entered as the input of the optimization. Furthermore, the sum of the elements of the binary matrix that indicate the charging status and those that show the running status for a vehicle performing travel must be less than 1, as indicated in Equation (11)

Finally, the power charged or discharged from the EVs in the fleet must be lower than the power capacity of the feeder (P;) to which the charging station is connected:

Batteries wear modeling:

The function w in Equation (1) is calculated in two ways:

a) The wear is calculated with the methodology presented by Xu et al (2018) using the Rain-flow algorithm.

This algorithm identifies the peak points of the charging/discharging profile. Then, from, these peak data, the half and complete equivalent cycles from the profile are calculated, using the algorithm detailed by Blumenthal (1935), and entered as inputs of the wear function that is described in Equation (13)

where the constant C¡, takes into account the equivalent present value of the replacement costs for a defined Capital Recovery Factor, and the constants k1, k 2 are defined by the battery manufacturer. The variable A takes a value of 1 for complete cycles, and a value of 0,5 for half cycles.

This study proposes a novel approach to calculate the peak data from the charging/discharging profile in order to compute the Rain-flow algorithm and calculate the sub-gradient of this function for solving the optimization problem with nonlinear methods based on the gradient. The peak data from the charging/discharging profile for the i-th EV and the j-th time step can be extracted using Equation (14)

The logic of the Rain-flow (RF) can be implemented using conditional operators, to identify the halfand complete cycles from the peak data. The objective function is not differentiable at some points, the cycle junction points. Therefore, the subgradient function is defined in Equation (15) based on the approach presented by Xu et al. (2018).

where the points j 1 and j 2 are the cycle junction points between the point j.

However, considering a fleet of more than 1 EV, the nonlinear optimization problem described in Equations (1)-(15) becomes a mixed-integer nonlinear problem. Hence, in order to achieve results with a lower complexity and computation time, the wear calculation is reformulated.

b) The wear is calculated with the Achievable Cycle Count (ACC), based on the approaches presented by Choi and Kim (2016) and Han et al. (2014).

The wear can also be calculated using the cycle life curves of the battery, given by the manufacturer. This cycle life is determined by how deeply the battery is used, i.e. by the depth of the discharge (D = 1 - S). Hence, a relationship between D and the life cycle must be established. In the literature, this relationship is commonly modeled by a polynomial function as in the studies of Choi and Kim (2016) and Han et al. (2014), where the cycle life N cycle is determined with the polynomial function of Equation (16).

where constants a and b are estimated from the manufacturer data. The wear cost is calculated as Choi and Kim (2016):

w d (s) is the wear-out density function, which is calculated as Equation (18) shows:

In Equation (18), the constant Cb takes into account the equivalent present value of the replacement costs for a defined Capital Recovery Factor. Hence, the complete expression for the battery wear is given in Equation (19).

A linear approximation for polynomial expressions is proposed on the integral calculated in the Equation (19). Thus, the approximated wear is:

where p 1 is the slope of the linear function approximating the polynomial expression of Equation (19).

Once the wear function of Equation (20) is considered, the optimization problem becomes a mixed-integer convex problem, whose solution is presented in the Results and analysis section.

Study case

Two study cases are considered. The first one, which is more reduced than second, is used to compare the wear obtained using both proposed approaches. The second study case, which contains the data demand described in Ruiz et al. (2018), is used to apply the proposed control algorithm for a fleet of EVs.

First study case:

The first study case considers one electric vehicle, a Renault Twizy. The travels performed by the EV in the evaluation period are predicted from the behavior of co-housing users described by Semanjski and Gautama (2016). The operating hours of this vehicle are between 5:00 and 16:00. The energy consumption in each travel is calculated with the daily travels, which are generated randomly. The random generation of daily travels uses a normal distribution for the distance of each travel and the number of travels per day, taking into account the next parameters: a daily average traveled distance of 8,4 km, and a daily average of travels performed of 3. Three days were simulated. The parameters considered for the wear function were taken from the study of Correa-Florez et al. (2018) and are presented in Table 1.

Table 1 Features of the electric vehicles 

Source: (Correa-Florez et al., 2018)

Hence, with the energy consumption data already calculated, this study case only requires the execution of the steps indicated in the Control Algorithm block in Figure 1. The optimization, including the wear cost, was solved using Matlab 2015b. Three optimization cases were taken into account: the first case without considering the wear cost, the second case using the Rain-flow algorithm to calculate the wear cost, and the third case that includes the wear cost and uses the ACC function to calculate it. The solutions of the first and third optimization problems were found with the CVX optimization tool and the Gurobi solver, as both are convex problems. Gurobi uses the Branch and Cut algorithm. The solution of the second case was found using the fmincon function of the MATLAB Optimization Toolbox with the Active-Set optimization algorithm.

Second study case:

The study case used to apply the algorithm of Figure 1 includes the traffic network, and the passengers demand described by Ruiz et al. (2018), which presents a study case applicable for the city of Medellfn, Colombia. The urban traffic microsimulation to calculate the required travels and power consumption in them was performed using the software SUMO. The electric vehicles considered are BRTs Type 1, as described in Ruiz et al. (2018), whose energy capacity is 324 kWh. The data of the required travels and power consumption in them were taken from Ruiz et al. (2018), taking into account only the travels performed by BRTs Type 1. The electricity price time series and the power limit for the feeder of the charging station were also taken from the aforementioned study.

The parameters considered for the evaluation of the batteries aging are presented in Table 1 with a replacement cost of batteries of USD 5 400. This wear calculation was done only with the ACC approach, using Equation (20). Time steps of 10 minutes were considered, a simulation period of 24 hours, a fleet size of 5 BRTs, and 21 travels required to cover the passenger demand. The software used to compute the optimization was Matlab 2015b with the Gurobi solver.

Results and analysis

Results for the first study case:

Figure 2 illustrates the SOC of the battery without considering the wear, considering the wear and calculating it with the Rain-flow algorithm (RF) and with the Achievable Cycle Count ACC.

Source: Authors

Figure 2 Comparison of the SOC for the different presented approaches for the wear calculation. 

The value of the wear is USD 0,04 calculated with the integral of the ACC, and USD 0,07 with the Rain-flow algorithm.

Figure 2 shows the SOC for the wear calculated with the Rain-flow algorithm. The result is more conservative compared with the other cases, because the Rain-flow algorithm performs two approximations. The first approximation evaluates the wear function for the difference of SOC between two points, instead of calculating the difference of the wear function evaluated at two different points, as in the wear density function presented in Equation (19). The second approximation is the cycle account, in which the non-peak data from the SOC profile is neglected, and half cycles are added. In addition, to extend the Rain-flow algorithm for a fleet of EVs, the use of Mixed-Integer Nonlinear optimization methods is required, which have a higher computational complexity than methods based on Mixed-Integer Linear Programming.

The computing time was 379 seconds for the wear calculated with the Rain-flow algorithm, and 6 seconds using the linear approximation for the integral of the wear density function. Hence, for the second study case, the wear density function is used.

Results for the second study case:

The SOC for the fleet of EVs is illustrated in Figure 3. This Figure shows that the SOC of all the EVs in the fleet increases around the time intervals 2:00 - 5:00, and 16:00 - 18:00. Those intervals correspond to the lowest electricity price hours for non-operating hours, i.e. the vehicles are charged at hours when the electricity is cheaper.

Source: Authors

Figure 3 SOC for each EV in the fleet. 

Furthermore, from the results shown, it can be concluded that allowing the V2G mode, the fleet operating costs are reduced by 50%. The obtained average SOC for the EVs in the fleet is illustrated in Figure 4, without considering the batteries wear cost and considering it.

Source: Authors

Figure 4 Comparison of the average batteries SOC with and without the inclusion of the wear cost. 

The average SOC presents a peak reduction considering the wear cost. This smoothing in the SOC impacts on the revenues that can be obtained by delivering power to the electric network, since the charging/discharging power cycles are more constrained and generate an overrun cost of USD 0,59 per day. This overrun cost is compensated with the savings in the batteries wear, which represents 26,03 % of the operating costs. The obtained error compared with the non-approximated wear cost presented in Equation (19) was 20,7%, which is equivalent to USD 0,01 per day.

Conclusions

This paper presents a control strategy to manage the charging and discharging power of a fleet of EVs that participate actively with the power network in V2G mode. This control strategy includes the wear of batteries in the operative costs, which are minimized. Two approaches were used for the wear calculation: the Rain-flow algorithm and the integral of the wear density function. Also, the control strategy, considering the integral of the wear density function, was applied to a fleet of EVs for the individual calculation of batteries wear, which is performed simultaneously with the assignment of routes to the EVs in the fleet and the calculation of charging/discharging profiles. Results showed that with the inclusion of the wear cost, the V2G mode is still profitable, but the revenues of the fleet operator are reduced to half approximately. The Rain-flow method delivers more conservative results for the wear estimation since it counts half cycles, but the ACC method allows the linearization of the optimization problem.

Hence, a lower computational complexity is required to solve the optimization problem.

Additionally, the proposed control strategy depends on the parameters of the wear function given for the battery. This function must be approximated applying operative tests. Hence, to extend the proposed strategy the validity of the wear parameters must be verified for the batteries of the considered fleet.

Acknowledgements

The authors would like to thank Colciencias for its support with the doctoral scholarship of the call number 757 of 2016 and the Project "Estrategia de transformación del sector energético Colombiano en el horizonte de 2030" of the call 778 of Colciencias. Contract FP44842-210-2018.

References

Alkhafaji, M., Luk, P., and Economou, J. (2017). Optimal Design and Planning of Electric Vehicles Within Microgrid. In: Li K., Xue Y., Cui S., Niu Q., Yang Z., Luk P. (eds) Advanced Computational Methods in Energy, Power, Electric Vehicles, and Their Integration. Singapore: Springer. DOI: 10.1007/978-981-10-6364-068 [ Links ]

Blumenthal, B. A. (1935). A new definition of the rainflow cycle counting method, International Journal of Fatigue, 2(2), 571-586 [ Links ]

Bocca, A., Chen, Y., Macii, A., Macii, E., and Poncino, M. (2018). Aging and cost optimal residential charging for plugin EVs. IEEE Design and Test, 35(6), 16-24. DOI: 10.1109/MDAT.2017.2753701 [ Links ]

Choi, Y., and Kim, H. (2016). Optimal scheduling of energy storage system for self-sustainable base station operation considering battery wear-out cost. Paper presented at the International Conference on Ubiquitous and Future Networks, ICUFN. Vienna, IEEE. DOI: 10.1109/ICUFN.2016.7537010 [ Links ]

Correa-Florez, C. A., Gerossier, A., Michiorri, A., and Kariniotakis, G. (2018). Stochastic operation of home energy management systems including battery cycling. Applied Energy, 225 1205-1218. DOI: 10.1016/j.apenergy.2018.04.130 [ Links ]

Firnkorn, J., and Muller, M. (2015). Free-floating electric carsharing-fleets in smart cities: The dawning of a post-private car era in urban environments? Environmental Science and Policy, 45, 30-40. DOI: 10.1016/j.envsci.2014.09.005 [ Links ]

Han, S., Han, S., and Aki, H. (2014). A practical battery wear model for electric vehicle charging applications. Applied Energy, 113, 1100-1108. DOI: 10.1016/j.apenergy.2013.08.062 [ Links ]

Kang, J., Duncan, S. J., and Mavris, D. N. (2013). Realtime scheduling techniques for electric vehicle charging in support of frequency regulation. Procedia Computer Science, 16, 767-775. DOI: 10.1016/j.procs.2013.01.080 [ Links ]

Rabiee, A., Sadeghi, M., Aghaeic, J., and Heidari, A. (2016). Optimal operation of microgrids through simultaneous scheduling of electrical vehicles and responsive loads considering wind and PV units uncertainties. Renewable and Sustainable Energy Reviews, 57, 721-739. DOI: 10.1016/j.rser.2015.12.041 [ Links ]

Ruiz, S., Arroyo, N., Acosta, A., Portilla, C., and Espinosa, J. (2018). An Optimal Battery Charging And Schedule Control Strategy For Electric Bus Rapid Transit. Paper presented at the MOVICI-MOYCOT 2018: Joint Conference for urban Mobility in the Smart City J. Medellin, German Aerospace Center (DLR) and Universidad Nacional de Colombia, Sede Medellin. DOI: 10.1049/ic.2018.0004 [ Links ]

Seign, R., Schussler, M., and Bogenberger, K. (2015). Enabling sustainable transportation: The model-based determination of business/operating areas of free-floating carsharing systems. Research in Transportation Economics, 51, 104-114. DOI: 10.1016/j.retrec.2015.10.012 [ Links ]

Semanjski, I., and Gautama, S. (2016). Forecasting the state of health of electric vehicle batteries to evaluate the viability of car sharing practices. Energies, 9(12). DOI: 10.3390/en9121025 [ Links ]

Wu, T., Yang, Q., Bao, Z., and Yan, W. (2013). Coordinated energy dispatching in microgrid with wind power generation and plug-in electric vehicles. IEEE Transactions on Smart Grid, 4(3), 1453-1463. DOI: 10.1109/TSG.2013.2268870 [ Links ]

Xu, B., Shi, Y., Kirschen, D. S., and Zhang, B. (2018). Optimal regulation response of batteries under cycle aging mechanisms. Paper presented at the 2017 IEEE 56th Annual Conference on Decision and Control, CDC. Melbourne, IEEE. DOI: 10.1109/CDC.2017.8263750 [ Links ]

How to cite: Ruiz, S. and Espinosa, J. (2019). Optimal vehicle-to-grid strategy for a fleet of EVs considering the batteries aging. Ingeniería e Investigación, 39(2), 69-75. DOI: 10.15446/ing.investig.v39n2.78639

Recibido: 23 de Marzo de 2019; Aprobado: 25 de Julio de 2019

Attribution 4.0 International (CC BY 4.0) Share - Adapt